Sega has developed an intelligent test system for GIS equipment, creating an automated test system that integrates functional verification and safety detection, and fully guarantees the performance reliability and electrical safety of GIS control cabinet products.
The system operates through the coordinated interaction of three core modules: the control cabinet, the simulation cabinet, and the operator’s console. The control cabinet serves as the central control unit, responsible for logic instruction conversion, equipment status monitoring, and bidirectional communication. The simulation cabinet accurately replicates various operating and fault conditions of GIS equipment, creating a closed-loop testing environment that comprehensively verifies the functional integrity of the control cabinet. The operator’s console integrates multiple capabilities, including withstand voltage testing, insulation resistance testing, and grounding resistance testing, serving as the critical checkpoint for ensuring the electrical safety of the product.
As the core link of the whole test system, withstand voltage test actively investigates potential manufacturing hidden dangers such as insulation layer defects and insufficient electrical clearance by simulating extreme overvoltage scenarios such as lightning strike, switch operation and system failure, verifies the insulation safety margin of equipment, avoids safety risks such as insulation breakdown and electric shock from the source, and meets many compulsory safety certification standards at home and abroad.
At present, the system can cover 110kV-550kV full-voltage GIS control cabinet, adopt the efficient structure of “unified safety test of analog cabinet grouping professional inspection console”, and strictly implement the standardized process of “withstand voltage pre-verification-functional closed-loop test-qualified product delivery. The commissioning of the system will greatly improve the factory inspection efficiency and quality consistency of the GIS control cabinet, and provide a solid support for the stable operation of the power system.
Figure 1:GIS Simulation Cabinet
Attached Drawing 2: Insulation Withstand Voltage Test Cabinet